An RV pad beside the house, a wider driveway, a sport court or a shed slab all start the same way: dig out the soft top layer, bring the ground to grade, build up and compact a base, and leave a flat, firm surface for gravel or concrete.

Yellow motor grader parked on a dirt road
Graders and compactors set the base for a pad or driveway. Stock photo: ElyPenner / Pixabay, Pixabay Content License.

Steps

  1. Lay it out.Mark the pad and check the setbacks, HOA rules and any easement.
  2. Excavate.Remove topsoil, roots and soft material to the planned depth.
  3. Grade for water.Slope the pad so runoff goes away from the house and walls.
  4. Build the base.Place and compact base material in lifts.
  5. Haul the extra.Dirt that comes out has to go somewhere. See hauling.

Prices

Angi's Phoenix-area guide puts a typical excavation job at $1,844 to $6,083, with leveling at $5 to $15 per cubic yard, hauling at $10 to $30 per cubic yard and an operated machine at $105 to $260 an hour. The gravel or concrete on top is priced separately.

RV gates

An RV pad usually means a wide gate, and wide gates on a pool lot fall under Gilbert's barrier rule: a double-width gate that isn't the only way in or out stays padlocked when not in use. See pool fence and setbacks.

Questions and answers

What does an RV pad excavation cost?

We don't have a Gilbert price list. Angi's Phoenix-area guide lists leveling at $5 to $15 per cubic yard and hauling at $10 to $30 per cubic yard, with machine time at $105 to $260 an hour.

Get your pad quoted

Fill in the form or give us a call, and a local excavation contractor will be in touch. There's no cost to ask.

Call (602) 905-4044

If it goes to voicemail, leave your name, number and address, and tell us what you need dug or moved.

Get an excavation quote

A local contractor will contact you about your request. Privacy